STRUX® 90/40 Macro-Fibers Utilized to Complete Metropolitan Miami 2

A towering opportunity for innovative concrete construction
Project
Metropolitan Miami 2
Owner
MDM Development and O’Neil Group
Contractor
Baker Concrete Construction, Fort Lauderdale, FL
Ready Mix Supplier
CEMEX USA, Miami, FL
GCP Solutions
STRUX® 90/40 macro fibers
Project

Located in the heart of bustling Miami, Florida, the Metropolitan Miami 2 development includes a 47-story tower with 700,000 square feet of office space linked to a 22-story hotel. The tapered towers rise from a 14-story podium that includes office and hotel lobbies, a ballroom, meeting space, retail shops and a restaurant and lounge. The project also includes 29 floors of composite metal decks that were specified to be constructed with welded wire mesh.

"Working with GCP, we were able to show our customer they could achieve the slump, pumpability and finish they were looking for with STRUX® macro fibers — and once we went into production, everyone was happy."
Challenge

While welded wire mesh is a traditional construction technique that adds durability, it is also time consuming. With 29 floors to cover and a total of one day per floor to weld down wire mesh, a solution that could cut down on time while providing the same durability and performance was needed. Additionally, wire mesh represents a trip hazard, and prevents workers from getting a foothold on the edge of a building. Working with technical services experts from CEMEX and GCP, representatives from Baker Concrete Construction determined that STRUX® 90/40 synthetic macro fiber reinforcement was the best option from a time, safety and budget standpoint.

Solution

Using STRUX® 90/40 instead of welded wire mesh eliminated mesh trip hazards, storage concerns, costly crane time, materials movement and the many hours required to place the mesh. It was a complete success. Baker Concrete Construction pumped the STRUX® mixture up 29 floors, representing a 640-foot vertical rise, without any issues.

“We were able to show Baker Concrete a 7-inch water slump to achieve the consistency and pumpability they were looking for,” said Albert Romanach, CEMEX’s area manager of technical services. “We also showed them that with the type and high quality of the fibers we were using  from GCP, would achieve the quality finish they wanted.”

Additional Rewards of Safety, Cost, and Speed

The use of STRUX® macro fibers immediately eliminated the safety hazards inherent with the use of welded wire mesh, while delivering improvements in both cost, speed and safety. Baker Concrete Construction was able to save the cost of the wire itself, plus the cost of shipping, hoisting, and installation.

Lastly, the project was able to save an immense amount of time. "We saved 38 days on the job," said Hans Rowland, Project Manager at Baker Concrete Construction. "It would have taken one day to install the welded wire mesh for each of the 38 pours. That adds up to real dollars saved and a value-add for our customers.”

Blue360SM

By switching from welded wire mesh to STRUX® 90/40, the designers of the Metropolitan Miami saved time and money while achieving a product with superior performance. That’s the promise of Blue360SM.

Blue360sm Product Performance Advantage.

Because every project, large or small, deserves the best level of protection.

ca.gcpat.com | North America customer service: 1-877-4AD-MIX (1-877-423-6491)

Ce document est à jour seulement à la date de la dernière mise à jour indiquée ci-dessous et n'est valide que pour une utilisation au Canada. Il est important que vous consultiez toujours les informations actuellement disponibles sur l'URL ci-dessous pour fournir les informations les plus récentes sur le produit au moment de l'utilisation. Des documents supplémentaires tels que les manuels de l'entrepreneur, les bulletins techniques, les dessins détaillés et les recommandations détaillées ainsi que d'autres documents pertinents sont également disponibles sur www.ca.gcpat.com. Les informations trouvées sur d'autres sites Web ne doivent pas être utilisées, car elles peuvent ne pas être à jour ou applicables aux conditions de votre site et nous déclinons toute responsabilité quant à leur contenu. S'il y a des conflits ou si vous avez besoin de plus d'informations, veuillez contacter le service client de GCP.

Last Updated: 2018-12-12

https://ca.gcpat.com/en/about/project-profiles/strux-9040-macro-fibers-utilized-complete-metropolitan-miami-2