Dealing with Murphy’s Law on flooring projects

While every flooring job has its own peculiar challenges, there is one thing you can pretty much count on: surprises. You plan out your project schedule and labor requirements ahead of time to maximize your crew’s efficiency and dovetail perfectly with other trades on the job. But something always seems to pop up.

Perhaps another trade is delayed or the general contractor has to shift trades around for some unforeseen reason. Or, just as likely, you arrive onsite only to find that the concrete slab isn’t fully dry or some other moisture intrusion issue has appeared out of the blue.

Contact a flooring specialist today

Moisture-related floor failures are becoming more common due to accelerated construction schedules. Over time, this moisture can cause serious deterioration to the flooring, including delamination, discoloration, blisters, re-emulsification of adhesives, mold growth, and odor problems. It is estimated that moisture-related flooring problems cause more than $1 billion annually in the U.S. alone.

The time to address moisture problems is before the flooring is installed. This can delay the project schedule and require additional material and labor resources that the contractor did not plan for—or include in the original bid. That may require a change order, further delaying progress.

Given how common moisture problems are today, flooring contractors should build moisture mitigation into their schedule. That may mean educating the general contractor (GC) about the importance of moisture mitigation to the performance and lifespan of the finished floor—and to reducing the GC’s risk of a call-back.

To minimize the impact on project schedules and budgets, it is wise to seek out moisture mitigation solutions that are fast and easy to install, and that do not involve time- and labor-intensive preparation of the concrete slab. It is important to avoid methods that require noisy shot-blasting of the slab.

They say that fortune favors the prepared. Thinking ahead and preparing your moisture mitigation strategy well in advance of a flooring project will help minimize Murphy’s impact on your productivity.

"Question on a project? Design Advantage experts provide technical consultation throughout project design and construction. We'll work closely with your team to get everybody on the same page, from specification to installation."
Tags
  • Airports
  • Architects
  • Arts & education
  • Commercial buildings
  • Contractor
  • Energy facilities
  • Engineer
  • Flooring
  • Repair and Renovation
  • Retail buildings
  • Schools
  • VersaShield